Part 4 — Stores, procurement and contracts
4.1 Stores, inventory and asset control
Store keeping controls public property from receipt to issue, use, transfer, verification and disposal. Physical custody and the accounting record must support each other.
| Control | Purpose |
|---|---|
| Authorised receipt | Confirm quantity, condition and specification before recording. |
| Secure storage | Protect against theft, damage and unauthorised use. |
| Issue documents | Show who received what, when and for what purpose. |
| Stock records | Maintain a running balance with location and custody information. |
| Physical verification | Compare actual items with the record and investigate differences. |
| Disposal | Use the authorised method, decision process and record. |
Stores are not ordered without financial provision and authority. The inventory book is balanced annually, custody is handed over on transfer, and the annual survey and test checks verify the stock. Unserviceable articles are condemned through the prescribed board or authorised procedure, and condemned articles are disposed of under the applicable rule.
Anchors: FR 716, 751, 754–760, 762–763, 770–772.
4.2 The procurement framework
Procurement converts an approved public need into a contract for goods, works or services. For goods, works and non-consulting services, the core framework is the Procurement Guidelines 2024 and the Procurement Manual 2024, read with later revisions, supplements and the applicable Public Finance Circulars. The National Procurement Commission publishes supplements.
Five principles govern the process:
- Competition: qualified suppliers receive a fair opportunity under the method that applies.
- Transparency: requirements are disclosed and decisions are documented and traceable.
- Fairness: the same stated criteria are applied consistently.
- Value for money: fitness, quality, lifecycle cost, risk and performance are considered, not only the lowest initial price.
- Accountability: decision-makers, approvals and reasons are identifiable.
The framework is not a set of preferences. A departure from the stated method or criteria is a procurement defect even where the outcome looks reasonable.
Anchors: Procurement Guidelines 2024 and Procurement Manual 2024, with supplements (document level).
4.3 Procurement planning and selection of method
Procurement begins with a real, budgeted and specified need, not with a preferred supplier. The planning record should answer:
| Question | Evidence |
|---|---|
| What is needed? | Clear scope, specification or terms of reference, and quantity. |
| Why is it needed? | Link to an approved function, project or service. |
| Is funding available? | Correct provision and timing. |
| Which method applies? | The current threshold, the nature of the requirement, the market and a rule-based justification. |
| When is it needed? | A realistic procurement and delivery schedule. |
| Who is responsible? | Named officers, committees and milestones. |
A requirement must not be divided artificially to fall below an approval or procurement threshold. The genuine requirement is analysed as a whole and the current rules are applied to it. Splitting a purchase to avoid a control is itself a procurement irregularity.
Anchors: FR 716, 717; Procurement Guidelines 2024 (document level).
4.4 Procurement committees and technical evaluation
The applicable framework determines the composition, appointment, authority and functions of procurement committees and technical evaluation committees. The safeguards are:
| Stage | Safeguard |
|---|---|
| Appointment | Correct appointing authority, suitable members, written appointment. |
| Conflict check | Declare interests and apply the required recusal or management procedure. |
| Evaluation | Apply the criteria stated in the procurement documents. |
| Clarification | Use only permitted clarification; do not rewrite a bid after closing. |
| Recommendation | Record the facts, scores or assessment, reasons and any dissent. |
| Approval | The competent authority decides within the applicable delegated limit. |
An evaluation that produces a recommendation without a documented basis cannot be defended on review. A member with an undisclosed interest undermines the whole committee's work, even if the recommendation is otherwise sound.
Anchors: Procurement Guidelines 2024 (document level).
4.5 Bid evaluation, award and contract management
The procurement process does not end at award. Poor contract management can destroy value even where the supplier was selected correctly.
| Phase | Control |
|---|---|
| Evaluation | Responsiveness, qualification and the stated criteria; arithmetic and technical review as applicable. |
| Award | Competent approval, notifications, required securities and contract formation. |
| Delivery | Quantity, quality, timing, milestones and acceptance. |
| Payment | Pay only against the contract terms and verified performance. |
| Change | Control variations and extensions through the authorised procedure. |
| Close-out | Final acceptance, defects and claims, securities, assets and records. |
The lowest quoted price is not automatically the best value. The evaluation method and criteria lawfully stated for that procurement decide what may be compared, and the relevant total cost, quality, performance and risk factors allowed by the framework should be considered.
Anchors: Procurement Guidelines 2024 (document level).
4.6 Donor-funded and special projects
A donor-funded project may operate under a financing agreement and procurement arrangements that must be read together with Sri Lankan law and authorised government procedures. "Donor funded" does not remove ordinary accountability.
| Area | Check |
|---|---|
| Financing agreement | Eligible expenditure, conditions, reporting and disbursement rules. |
| Procurement | Which approved framework applies, and where. |
| Accounts | Separate records or codes, reconciliation and reporting requirements. |
| Assets | Ownership, custody and transfer arrangements. |
| Audit | Required internal, external or project audit, and the response process. |
Foreign aid is administered within the Financial Regulations as well as the agreement. Where the two differ, the answer identifies the governing provision rather than assuming that one displaces the other.
Anchors: FR Chapter 11 (Foreign Aid); financing agreements (document level).